Construction

New commercial, commercial accessory and addition construction requires building, electrical, mechanical and plumbing permits. The building permit must be obtained and issued before trade permit can be applied for. Additional requirements may need to be met before a building permit can be issued depending upon the property location, zoning or based on design guidelines for the area. Permits also are required for construction that changes, moves or repairs walls, floors, ceilings, windows, doors, electrical, mechanical, or plumbing. 

Permits are not required for “cosmetic” remodels (floor or wall covering, cabinets, counter tops, shelving, etc.)

Apply now!

Residential building permits are for one to four family homes on individually platted lots. Permits are required for new construction, as well as work that changes, moves or repairs walls, floors, ceilings, windows, doors, electrical, mechanical or plumbing.

Permits are not required for “cosmetic” remodels (floor or wall covering, cabinets, counter tops, shelving, etc.)

Apply now!

flowchart for commercial application process
flowchart for commercial building inspection process
flowchart for single family residences