• Project: 2018 Bond Referendum Project #31 – Pharr-McAllen Drain
  • Owner: Hidalgo County Drainage District No. 1
  • Contractor: Mor-Wil, LLC
  • Project Start Date: February 17, 2020  
  • Project End Date: March 6, 2020
  • Project Scope: Pharr – Mcallen Drain consists of an installation of an additional storm structure at the Ridge Road crossing. The proposed structure consists of 10’ x 9’ reinforced concrete box along with ditch concrete rip-raps at both ends of the crossing and improvements to the existing roadway storm system.