Area Requirements A-O R-1 R-1A R-TH0 R-2
Min. Lot Req. 43,560 sq. ft 6,000 sq. ft. One full legally recorded lot 2,5000 sq. ft. 7,500 sq. ft
Min. Lot Frontage 100 ft. 50 ft. 25 ft. 20 ft., 30 ft. 60 ft.
Min. Lot Depth 200 ft. 100 ft. 70 ft. 60 ft. 100 ft
Front Setbacks 40 ft. 20 ft. 15 ft. 10 ft. 20 ft.
Rear Setbacks 10 ft. 9-5 ft. 10% depth 0 15 ft.
Side Setbacks

(internal – corner lots)

6 ft.

10 ft.

5 ft.

10 ft.

3 ft.

7 ft.

6 ft.

10 ft.

5 ft.

10 ft.

Min. Dist. Between Bldgs. 12 ft. 10 ft. 10 ft. 10 ft. 10 ft.
Min. Dist. From Public ROW to entrance of garage 18 ft. 18 ft. n/a 18 ft. 18 ft.
Max. Bldg. Coverage n/a 50% n/a 80% 50%
Max. Amount of impervious coverage n/a n/a n/a n/a n/a
Amt. Of landscaped area n/a n/a n/a n/a 10% of lot
Max. height of structures 35 ft. 36 ft. 36 ft. 36 ft. 36 ft.
Off-street parking space 2 2 1 2 2
Area Requirements R-3 R-4 R-MH R-HCMH SD R-HCMH Park
Min. Lot Req. 8,000 sq. ft.

9,000 sq. ft.

18,000 sq. ft. M-H: 4,500

P-H: 2,500

R-V: 1,800

10 lots

6,000 sq. ft

5 acres

HUDMH: 4,000

R-V: 1,500

5 acres HUDMH: 4,000 R-V: 1,500 70 ft. 70 ft. M-H: 45 ft.

P-H: 36 ft.

R-V: 30 ft

50 ft. HUDMH: 50 ft.

R-V: 30 ft.

Min. Lot Depth 100 ft. 100 ft. M-H: 70 ft.

P-H: 60 ft.

R-V: 50 ft.

100 ft. HUDMH: 90 ft.

R-V: 60 ft.

Front Setbacks 20 ft. 20 ft. 20 ft. 20 ft. 10 ft.,

5 ft.

Rear Setbacks 15 ft. 15 ft. 10 ft. 10 ft. 5 ft.
Side Setbacks

(internal – corner lots)

7 ft.

15 ft.

7 ft.

15 ft

5 ft.

10 ft.

5 ft.

10 ft.

5 ft.
Min. Dist. Between Bldgs. 14 ft. 12 ft. 10 ft. 10 ft. 10 ft.
Min. Dist. From Public ROW

to entrance of garage

18 ft. 18 ft. 18 ft. 10 ft.

5 ft. (carport)

10 ft.

5 ft. (carport)

Max. Bldg. Coverage 50% 50% 70% 50% n/a
Max. Amount of impervious coverage n/a n/a n/a n/a n/a
Amt. Of landscaped area 10% 10% n/a n/a n/a
Max. height of structures 36 ft. 36 ft. 25 ft. 36 ft. 25 ft.
Off-street parking space * * M-H: 2

R-V: 1

2 M-H: 2 R-V: 1
Area Requirements O-P N-C C C-2 H-C
Min. Lot. Req. 6,000 sq. ft. 6,000 sq. ft.

15, 000 sq. ft. (6)

9,000 sq. ft. n/a 9,000 sq. ft.
Min. Lot Frontage 50 ft. 50 ft. 65 ft. n/a 65 ft.
Min. Lot Depth 100 ft. 100 ft. 200 ft. n/a 200 ft.
Front Setbacks 20 ft. 60 ft. (6)

30 ft. (7)

20 ft. (10) 0 ft. (12) 20 ft. (10)
Rear Setbacks 0 ft. (1)

10 ft. (2)

0 ft. (8)

10 ft. (9)

0 ft. (1)

10 ft. (2)

0 ft. (1)

10 ft. (2)

0 ft. (1)

10 ft. (2)

Side Setbacks (internal – corner lots) 0 ft. (3)

6 ft. (5)

10 ft. (4)

0 ft. (3)

5 ft. (5)

10 ft. (4)

0 ft. (3)

6 ft. (5)

10 ft. (4)

0 ft. (3)

6 ft. (5)

10 ft. (4)

0 ft. (3)

6 ft. (5)

10 ft. (4)

Min. Dist. Between Bldgs. 0 ft. (3)

12 ft. (5)

0 ft. (3)

12 ft. (5)

0 ft. (3)

12 ft. (5)

0 ft. (3)

12 ft. (5)

0 ft. (3)

12 ft. (5)

Min. Dist. From Public ROW

to entrance of garage

n/a n/a n/a n/a n/a
n/a 40% 40% 50% 100% 80%
Max. Amount of impervious coverage 80% 80% 90% 100% 95%
Amt. Of landscaped area 20% 15% of
street yard
10% of lot n/a 5% of lot
Max. height of structures 50 ft. 36 ft. 36 ft. 10 stories 36 ft.
Off-street parking space * * * * *
Area Requirements L-I H-I
Min. Lot Req. 2 acres 10,000 sq. ft.
Min. Lot Frontage 100 ft. 65 ft.
Min. Lot Depth 200 ft. 100 ft.
100 ft. 20 ft. (10) 20 ft. (10)
Rear Setbacks 15 ft. (1)

30 ft. (4)

0 ft. (1)

10 ft. (2)

30 ft. (4)

Side Setbacks

(internal – corner lots)

15 ft. (3 or 4)

30 ft. (4)

0 ft. (3)

6 ft. (5)

30 ft. (13)

Min. Dist. Between Bldgs. 0 ft. (3)

15 ft. (5)

0 ft. (3)

12 ft. (5)

Min. Dist. From Public ROW to entrance of Garage n/a n/a
Max. Bldg. Coverage 60% 95%
Max. Amount of impervious coverage 80% 95%
Amt. Of landscaped area 20% of lot 5% of lot
Max. height of structures 36 ft. 36 ft.
Off-street parking space * *

FOOTNOTES:
1. With fire retardant wall, alley, or abutting non-residentially zoned property.
2. Without fire retardant wall or alley or abutting residentially zoned property.
3. With fire retardant wall.
4. Abutting residentially zoned property or side yards adjacent to street.
5. Without fire retardant wall.
6. With gasoline sales (pump and pump canopy 15′ front setback).
7. Without gasoline sales.
8. With alley.
9. Without alley.
10. Or 1/3 the street R.O.W. width on which the property fronts.
11. Or 4 foot for each 1 foot of setback from the closest property line.
12. Plus half the building height over 36 feet.
13. Abutting non-residentially zoned property.

* See off-street parking ordinance.

Countdown
Day
Hrs
Min
Sec
October 12th